Traditional Style Bathroom Renovation
With all the trades on board, we handled this newly converted bathroom (originally the client’s office) in just 10 working days.
We started by bringing in all the new electrical, plumbing and heating services. Our joiners lowered the ceiling to allow new spotlights to be installed. The back wall was formed to allow a new bathroom extractor fan with ducting to be located in. This gave us scope to add a recessed shelf behind the bath.
The walls were straightened out by our plasterer, giving our tiler perfect walls to work on. We added underfloor heating, with a touch screen control. Traditional fixtures and fittings were installed to tie in with the period of the house. The walls were finished with Craig & Rose paint.